Sign In | Join Free | My chinacomputerparts.com
China Kaiping Zhonghe Machinery Manufacturing Co., Ltd logo
Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Honesty is the foundation of harmony, quality is the way of survival, the market is the source of harmony benefits, innovation is the soul of harmony development, the brand is the god of the growth of
Verified Supplier

4 Years

Home > Excavator Pile Driving >

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Brand Name : Zhonghe

Model Number : CLB01

Certification : CE

Place of Origin : China

MOQ : 1

Price : Negotiate

Payment Terms : T/T, discussion

Supply Ability : 60 pcs per month

Delivery Time : 10-15 working days

Packaging Details : Wooden case, bubble bag or iron frame support

Type : excavator boom arm for pile driving

Condition : Good & new

Warranty : 180 days

After-sales service provided : quick reply online

Maximum length : 13.5-20 meters

Counterweight : Up to your model

Drilling Angle : Adjustable

Drive System : Hydraulic

Product Name : Excavator Pile Driving

Structure : Integrated

Contact Now

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Catalogue ZH excavator boom arm.pdf

ZHONGHE excavator pile driving boom

The pile driving arm of the excavator uses the high-frequency vibration of the vibration hammer to transfer to the pile with high speed and downward force, resulting in the liquefaction of the soil structure around the pile due to the vibration, so as to reduce the friction resistance between the pile and the soil. Then the pile is sunk into the soil through the pressure of the excavator, the vibration hammer and the weight of the pile, so as to ensure the perpendicularity and spacing accuracy of each column. This not only reduces the deflection of the posts, but also increases the overall stability of the fence.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe excavator pile driving arm’s advangtages

1. Q355B as default, Q690D optional.

2. Key Force-bearing Parts are Reinforced.
3. Welding is full and smooth.
4. Adopt national standard precision pipelines.
5. Boom bushing come with an alloy copper sleeve(with self-lubricating carbon powder inside).

6. Boom and sticks' angle can be opened to achive 160°

Zhonghe excavator pile driving features :

  1. High power hydraulic hammer: Zhonghe's pile driving attachments are equipped with high power hydraulic hammers that can deliver high impact force, allowing the attachment to drive piles to a range of depths and in a variety of soil conditions.

  2. Customizable design: Zhonghe offers a variety of pile driving attachments that are customizable to meet the specific needs of different excavator models and job site requirements. This can improve efficiency and reduce the need for additional equipment.

  3. Easy installation: Zhonghe's pile driving attachments are designed for easy installation, reducing downtime and labor costs. The attachment can be quickly and easily attached to the excavator without requiring additional welding or assembly of loose parts.

  4. Versatility: Zhonghe's pile driving attachments are designed to be versatile and can be used in a variety of soil conditions, including hard rock, clay, and sand. They are also able to drive piles to a range of depths, depending on the length of the boom and the power of the hydraulic hammer.

  5. Safety features: Zhonghe's pile driving attachments are designed with safety features such as a locking mechanism that prevents the hammer from drifting or slipping during use, reducing the risk of accidents and injuries on the job site.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE excavator pile driving arm configuration


Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe Machinery Main Product

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Company profile

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

TOP PICKS

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving ArmCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving ArmCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE MACHINERY'S ADVANTAGES

1. 14000㎡ Workshop with Precision Equipments

We has more than 14000㎡ steel structure standard workshop with a large number of high precision processing equipments.

2. High-tech R&D Team

We use precision drawing software to achieve the max working range under the premise of safe operation.

3. Customization

(1)Match all brand excavator.
(2)Color, length, material can do according to you.
(3)Extra pipeline can be added to suit to some extra application.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

CERTIFICATIONS

CE certification & Utility model patent certificatesCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE MACHINERY'S ADVANTAGES

1. 14000㎡ Workshop with Precision Equipments

We has more than 14000㎡ steel structure standard workshop with a large number of high precision processing equipments.

2. High-tech R&D Team

We use precision drawing software to achieve the max working range under the premise of safe operation.

3. Customization

(1)Match all brand excavator.
(2)Color, length, material can do according to you.
(3)Extra pipeline can be added to suit to some extra application.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

CERTIFICATIONS

CE certification & Utility model patent certificatesCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe excavator pile driving arm’s advangtages

1. Q355B as default, Q690D optional.


Product Tags:

21 Meters Excavator Pile Driving

      

Q355B Excavator Pile Driving

      

Q690D Excavator Pile Driver

      
China Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm factory

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Kaiping Zhonghe Machinery Manufacturing Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)